1, stirring
Add 90% of the construction water to the mixing vessel, then pour it into the diatom mud dry powder for a few minutes, then stir it with an electric mixer for about 10 minutes, stir while using another 10% water to adjust the construction consistency, muddy coating. Stir well before use.
2, smear
Two times: the first pass is about 1 mm after the finish is about 50 minutes (depending on the weather conditions, the surface is not sticky, and the bottom is covered with the material), the second pass (thickness is about 1.5) Mm).
The total thickness is between 1.5 mm and 3.0 mm.
3, texture pattern production
Most people like flat diatom mud. If you like personality, you can master the drying time according to the actual environment drying conditions, and make the texture pattern according to the engineering method.
4, receiving light
After the texture pattern is made, the light is collected by the light-receiving trowel along the pattern line.
Aluminium Alloy Swing Door Handle
Aluminium Alloy Swing Door Handle,Electronic Screen Panel Sliding Door Handle,Stainless Steel Door Handle,Zinc Key Hidden Wooden Door Handle
BOGO HARDWARE & FITTING CO.,LTD , https://www.bogo-hardware.com