Fine decoration can be less disputes

The bottom is an important step in the formal decoration process. It is the process of designing the direction of the construction side to hand over the drawings and determine the workability of the drawings. The complete submission can avoid the occurrence of many disputes in the later period. Therefore, at the time of delivery, the industry mainly confirmed the construction projects, and there were special designs and projects where designers and supervisors and supervisors were asked more questions so that unreasonable problems could be found in time, and additions and deletions could be avoided at a later stage.

The material must be complete

The submission is a step before the construction begins after signing the home improvement contract. At the time of submission, designers, owners, foremen, and supervisors were all required to attend the meeting. The designer explained the construction project.

The drawings that must be present at the time of bottoming include the original structure drawing, the structure dismantling and transformation drawing, the plane furniture layout drawing, the ground layout drawing, the ceiling layout drawing, the strong and weak electric circuit drawing, the water level diagram, the large sample drawing, the elevation drawing and the corresponding node The map should also have.

If the construction drawings are incomplete, construction workers will find it difficult to understand the relevant processes and may easily cause conflicts with the original design effects. For example, if the ceiling plan only has a floor plan, no facades and nodal maps, it is very difficult for the workers to grasp the ceiling height and the specific craftwork, and it is easy to “do it” with experience, which may conflict with the original design effect or simply reach the ceiling. Less than the original design effect. If there is no internal structure chart for the cabinet map, workers can easily “take care of it” according to the conventional practice, but it is very likely that they cannot meet the needs of the owners.

There are many situations in which the construction drawings are incomplete. The owner should ask the designer to make up the drawings before the start of construction to avoid the occurrence of construction and design inconsistencies.

Make it easy to stay hidden

A lot of designers come to the bottom of the game to look at the flowers, to make the bottom, and to explain the details. Before the scene is handed over, the designer should make an internal disclosure with the foreman, that is, he should explain the design details, structural demolition and modification, and special shapes. In this way, the foreman can find some links that are unreasonable or difficult to construct before the scene is handed over. They communicate with the designer and make changes. However, many designers have omitted this link.

However, the owners often think that the designers and the foremen explain clearly, and because there are more people at the time of the exchange, the content of the conversation is also very professional, and the owners who are prepared are also prone to confusion, and follow the designer in a hurry to walk around the scene. The end of the bill was signed. If the designer does not explain the process, or if he intends to conceal some special structures that are difficult to construct, he has hidden disputes for the decoration. In the later stage of construction, due to the unreasonable design, it is necessary to increase or decrease the project, the drawings may not reach the expected design results, or the drawings do not meet the on-site requirements, which are likely to cause problems such as over-expendation of decoration or extension of the construction period. These are the origins of disputes.

Do not understand ask for confirmation

Although many owners do not understand construction drawings and do not understand professional terminology, in order to avoid late-stage disputes, they must remember not to understand and ask questions in the event of site disputes. Once there are project changes, text confirmation will be required to protect the interests of the latter period.

The most effective way is for the owner to look at the budget book one room at a time. Look specifically at the construction projects in each room to see if some key designs can be achieved. Do not understand where to ask. Even if the designer wants to hide, because the construction involves, the foreman is responsible for the specific construction process, he will be very concerned about whether the design can be achieved and how to achieve it. The foreman will also question the unreasonable design.

In addition to the number of construction projects, the owner must also pay attention to the specific design, such as the thickness of the TV background wall and the height of the ceiling. Because of the difference in thickness and height, the practice is different, and the materials involved in the process and cost are not the same. For example, a 2 cm thick background wall only needs to be plastered with two layers of plasterboard, and a 3 cm thick background wall requires nails, but 6 cm or 8 cm. The centimeter-thick background wall requires the use of wooden keel and even ribbed steel keel framework. The materials are different, and the cost and aesthetics are different.

For the hydropower demolition and reconstruction part and the structural demolition reform part, it is necessary to ask the foreman and the supervisor. Since most designers do not go to the construction site when the water circuit is demolished, the owner needs to focus on the improvement and demolition of the water circuit. The designer is required to explain the position of the hydropower station, the location of the hot and cold water pipes, and so on. Leave a mark on the scene. At the same time, the supervisor and the supervisor were asked about the feasibility of the construction, such as whether the alignment of the line and the demolition of the wall were feasible.

For some verbal commitments at the site, the owner is also best requested to confirm the text. For some temporary addition items, such as the production of wooden cabinets on site, if the directly given to the foreman, the price will be favorable, but because there is no bill or bills added later, the quality of the cabinet can not be guaranteed, the owner did not France enjoys the company's warranty service. Therefore, if there are indications of additions and deletions and design changes, or some of the designers’ promises, the owners should insist on writing in the opinion column on the site to submit the endorsement slip to avoid later disputes.

Construction bottom decoration design room TV decoration furniture gypsum board ceiling price cabinet

Small Sunroom Extensions

With the increasing rise of duplex, villa and other room types, the Sunroom from the basic shape and function, has gradually developed into a chic leisure space in Chengdu families, the sunroom has excellent ventilation, lighting, heat insulation, sound insulation system, and there are a variety of modelling for you to choose from, flat roof, sloping roof, curved roof, triangular roof, etc., the sunroom is very rich in function, it can be used as a study room, dining room, studio, studio, flower room, and so on in the bright sunshine. Under the bright sunshine, one person enjoys quiet reading time, drinking afternoon tea with friends, chatting and playing games with children, gathering with family and so on it meets people's desire to get close to nature, it is a very ideal place for socialising and leisure. Choose a suitable sunroom for your home to enjoy nature, bathe in the sun, the desire to look at the starry sky can be satisfied infinitely.
Custom
A small sunroom is an architectural structure, usually located on the side or back of a house, made of glass or transparent material that allows sunlight to pass through and into the interior. It serves the following main purposes:
1. Increase indoor lighting: a sunroom allows more sunlight to enter the room, improving the lighting effect of the room and making it brighter and more comfortable.
2. Increase indoor temperature: sunroom can use solar energy to raise the indoor temperature, especially in winter, it can play the role of heat preservation and reduce the energy consumption of heating.
3. Provide leisure space: Sunrooms are usually designed as bright and warm space, which can be used as a place for leisure and entertainment, such as reading, resting, chatting and so on.
4. Improve indoor air quality: sunroom can increase the circulation of indoor air, which is conducive to eliminating indoor humidity and odour, and improve indoor air quality.
5. Increase the value of the house: the sunroom can add a unique landscape and functional space for the house, and enhance the overall value and attractiveness of the house.
Custom
Custom

sunroom design,sunroom cost,Sunroom Furniture

Foshan City JBD Home Building Material Co.,Ltd. , https://www.jbdhome.com