Skillful Chancheng floor paint Nanhai epoxy floor paint Shunde Foshan floor paint Sanshui
Epoxy floor paint construction plan
First, the treatment of the surface of the floor 1. The newly completed industrial floor must be constructed after a certain amount of maintenance, about 28 days. 2. Remove the surface of the cement slurry, old paint and adhering garbage. 3, thoroughly remove the surface of the oil, with the King oil cleaning agent. 4. Remove accumulated water and dry the tide thoroughly. 5, the surface cleaning needs to be done with a dust-free sweeper and a large vacuum cleaner. 6. The flat surface allows for a void of 2 to 2.5 mm, a water content of 6% or less, and a pH of 6 to 80. 7. The surface of the floor should be finished with a dust-free grinding machine and thoroughly cleaned with a vacuum cleaner. 8. Apply putty to the holes and obvious depressions on the surface of the floor to fill the scraping. After drying, grind the dust. Second, finishing seal coating 1. In the treatment of clean, flat surface, use high pressure airless spray or roller coating, epoxy seal primer. 2, epoxy sealer has a strong permeability, a certain amount of thinner should be added when the primer is applied, so that the diluted primer can penetrate into the interior of the base layer, enhance the adhesion of the coating and the base layer, and coat it. Must be continuous, not interrupted, the amount of coating is just the surface saturation. 3. Partial leakage coating can be applied by brush. The excess primer on the surface must be polished before the next process. Third, batch scraping scraping 1. Apply two batches of putty on the surface of the primer after solid (25 ° C, about 4 hours) to ensure the wear resistance, pressure resistance, collision, water, mineral oil, acid and alkali solution, etc. Performance and adjust the ground flatness. 2. Use 100-200 mesh quartz sand and epoxy batch scraping material as the first putty. It should be fully stirred and smoothed. This road is mainly used to enhance the wear and compression resistance of the ground. 3. Grind the first putty with a sand bag type dust-free rolling sander and vacuum it clean. 4. Use 200-270 mesh quartz sand and epoxy batch scraping material as the first putty. It should be fully stirred and smoothed. This road is mainly used to enhance the wear and flatness of the ground. 5. Grind the second putty with a sand bag type dust-free rolling sander and vacuum it clean. 6. After the two puttyes are dry, if there are pockmarks and cracks, they should be repaired first, then sanded with a flat sander to make them flat and cleaned. 7. The number of quartz sand used by the field engineer is determined according to the specific conditions of the ground. Fourth, the middle layer of the painted floor 1. On the surface of the putty after cleaning and cleaning (20 ° C, 24 hours), the intermediate layer is coated with epoxy floor coating. The coating method can be applied by brush coating, batch scraping, high pressure airless spraying, large area construction with high pressure airless spraying. For best, the spray pressure is 20 to 25 MPa. 2. This time, the ground can be more flat, and it is easier to find the defects still existing on the ground, so that the next layer can be leveled. 3. This time also facilitates Party A's arrangement of equipment installation. Fifth, finishing the floor surface 1. After the middle layer is dried, the epoxy floor layer is coated. The coating method is batch scraping and high pressure airless spraying, but high pressure airless spraying is preferred. 2. Before painting, sanding and vacuuming should be carried out on the middle layer with a sand bag type dust-free rolling sander. 3. If Party A is dry in the middle layer, the installation and commissioning of the equipment will be carried out first, causing new defects on the ground, applying the batch scraping material to level and polish, and vacuuming and cleaning the sprayed surface layer. Chuangyuan Pingping Paint Engineering Co., Ltd. Foshan Office: Service hotline, 0757-63367966 Manager Chen QQ Foshan Office Address: Tianan Digital City, Nanhai, Foshan Guangzhou Headquarters Address; Haitian Building, Guanghai Building, Zhongshan Road, Tianhe, Guangzhou Company website http:// 路路通http://gzcydpq.3566t.com/ Lights Network: http://shop.denghuo.com/369742/ Business treasure website: http:// Electromechanical home; http://GZCYDPQ.jdzj.com International Business Network http://gzcydpq.b2bvip.com/ Zhongke Business Network; http://GZCYDPQ/ Http://Company/Detail/213433.html http://guangzhou0428403.11467.com/ Http://gzcydpq.ximatou.com Http://gzcydpq.jdol.com.cn/ Http://gzcydpq.wjw.cn/ Http://gzcydpq.cn.cn5135.com Http://gzcydpq.cntrades.com/ Chinese supplier: http://gzcydpq.cn.china.cn/ Skillful Chancheng floor paint Nanhai epoxy floor paint Shunde Foshan floor paint Sanshui |
Elevator Traction Machine,Gearless Traction Elevator,Geared Traction Elevator,Gearless Elevator Motor
MAURER TECHNOLOGIES CO., LTD. , https://www.maurer-elevator.com