Villa renovation construction and acceptance standards how much money villa renovation

The outstanding features of the villa's decoration are that he can embody a person's living standards and art conservation. The villa decoration is a prominent home improvement design field in recent years. He is a combination of home improvement and art, and is also one of the outstanding points of interior decoration refinement. The villa can play a role in rejuvenating the body and mind on Sundays or holidays. There are many kinds of modern villa decoration construction projects, what kind of villa decoration is the most in line with your mind? Next I will give you a brief introduction to the villa decoration construction plan!

Villa decoration design

Neoclassical style

Neo-classical style villa renovations originated in ancient Roman times. Everyone in the United States will also see large sculptures, beautiful fountains, and Roman columns. These will also be found in the neoclassical courtyards. Compared with European style, it is more refined, exquisite and humanized. For example, the statues of small angels and the pedestals for birds to swim in the courtyard space will create a feeling of returning to nature.

2. Romantic rural style

The romantic rural style emphasizes a tranquil and vibrant environment, which is mainly represented by the British pastoral style. The performance of this style mainly includes ancient ornate manor houses, spacious green areas and winding paths with smooth pebbles, and the lace linen tablecloth is not only romantic, but also peaceful, with a kind of distance away. a feeling of.

3. American country style

This type of style is mainly expressed as free and casual, without excessive decorations, probably because the United States is a country that advocates freedom. Not only loses the atmosphere, but there is also a kind of extravagance. Not only is it rich in sentiment, but it also does not lack sense of self-confidence. It is another kind of demand for current life.

How much is the general renovation of the villa

There are many factors that affect the price of endorsement decoration, such as the choice of main materials, the choice of decorative materials, and the number of construction projects, which will produce a large gap. If you want to understand the final villa decoration costs, you need to ask the decoration company to develop a detailed renovation program, material program, accessories program can be determined.

First, the proportion of budget decoration

The total cost of the general villa renovation is about 15% of the villa price, and the distribution ratio for the decoration materials is: bathroom, kitchen: living room: bedroom: = 9:7:4. At present, the market price of low-grade decoration is 100-500 yuan per square meter, the mid-range decoration price is 1,500-2,000 yuan per square meter, and the high-end decoration price is 2,000 yuan per square meter.

Second, the budget of the decoration materials

After determining the grade of the decoration, you will know the basic cost of renovation needed, followed by the cost of the decoration materials. Decoration materials generally include wall materials, floor materials, plates, sanitary ware, and kitchen utensils. Before decorating, it's best to find out about the cost of not using brand decoration materials in the market, and then choose reasonable decoration materials.

Third, distinguish between the primary and secondary budget

When decorating a villa, there must be priorities, some rooms need to be renovated, and some rooms need only simple decoration. This can save a lot of costs, but also can make the main space more beautifully decorated. The current renovation trend is to first buy furniture after the renovation, because now the decoration materials change is very large, two or three years may be out of date. The furniture style and style can change the overall decoration style.

Fourth, the hall small bedroom decoration

Now generally for the decoration of the living room is much larger than the bedroom, for the decoration of the living room will spend more thought and money. Because the living room is the main embodiment of the entire family and the main place for people to entertain guests, the decoration of the living room can take more. The renovation of the bedroom has been simplified, mainly based on warmth, and there is room for accommodation problems.

V. Kitchen Bathroom Decoration

Throughout the renovation process, kitchens and bathrooms are the most expensive places to spend, and are also major renovations. The decoration of the kitchen and bathroom is not focused on decoration but on materials. The waterproofing of the bathroom and the kitchen must be done well. At the same time, the hardware of the bathroom and the kitchen should be used well and the quality guaranteed. Since the kitchen and the bathroom are all relatively humid places, efforts must be made in lighting.

Note; this price is for reference only! Due to geographical differences, of course, the price will be different. For more details on the prices, please refer to the local distributors!

  

Villa renovation construction

Villa renovation construction - item preparation

Before renovating a villa, prepare necessary items, such as a tape measure to be measured. He measures the size of the villa, a calculator, and a series of other construction tools. In the specific construction, it is best to personally measure the corners of the villa, then the notes in the book, the size of each room must be clearly marked. The most important of these is measuring the area of ​​the tiling, the area of ​​the wall paint, and the floor area. The next step is the demolition and reconstruction of the main villa. In the process of demolition and reconstruction, the main load-bearing wall of the villa is removed, the wall covering before renovation is removed, the doors and windows are replaced, and the garbage generated after the demolition is completed. Clean up in time to ensure clean interior decoration, but also to facilitate the construction.

Villa decoration construction - hydropower reform

The next step is to carry out the villa's hydropower reform project, hydropower reform must be cautious, once it is affixed to the top of the ceiling, then it is very difficult to make additional transformation, so we must be sure that such as Switching the exact location of lighting and washing machines, before carrying out hydropower reforms, we must hire relevant designers to conduct on-site measurements and help us determine a good power waterway reconstruction plan. In this case, we must also design the location of the water heater's power interface. After hydropower reform, the next step is to design pipes for some bathrooms and kitchens. If the pipe diameters are too large, then we should fully consider the environment where toilets and kitchens are prone to moisture. Therefore, some corrosion-resistant materials must be used.

Villa renovation construction - laying floor

Then come to lay the floor tiles, dormitory bathroom floor tiles, be sure to install a good floor drain, to have both deodorant function. During the laying process of tiles, pay attention to the overall aesthetic of the whole floor tile, and do not leave gaps. Therefore, when laying floor tiles, it is necessary to measure the corresponding size. The next step is to paint the wall. When painting the wall, it is generally necessary to use some environmentally-friendly paint. Because it does not have any odor itself, and when the paint is dry, there is no need for additional The air-dried, and its color will be more profound, at least brush it twice, and some places even have to brush 3 times. In order to prevent the paint from falling out in the future, when the wall paint is brushed, the wall surface is affixed with wallpaper, and the selection of the wallpaper is generally based on personal preference, but also based on the actual color of our furniture.

Villa decoration acceptance

First, the villa decoration masonry tile, tile project acceptance

1. The materials and patterns should meet the requirements of residence and placement, and the quality of the products meet the national standard special grade and first grade product specifications.

2, tile paving should be solid, not loose, no empty.

3, tile pattern is clear, no pollution, no cracks.

4, the tile surface color is consistent, uniform seams, the surrounding straight, brick surface without cracks, missing powder and other phenomena.

5. The floor slope of the toilet satisfies the drainage requirements and does not flow backwards or water, and the junction with the floor drain is tight and firm.

6. The allowable deviation of tiled tiles and floor tiles is equal to or less than 3mm, and the seam height is less than 2mm.

7, porcelain, floor tiles loss calculated by 10%.

Second, villa decoration paint project acceptance standards

1. The paint project should be accepted after the paint project is completed and dried.

2, the paint project does not allow leakage brushing, peeling, spots.

3, check the paint brand, color should meet the requirements of the household, design selected sample requirements.

4, brown eyes must all be flattened. With the surface of clear water, lacquer, and matt lacquer, the grain must be clear.

5. No sagging, brown eyes, wrinkled skin or pinholes are permitted on the surface of the paint.

6, the paint color is basically the same, no brush pattern. The paint surface should be smooth and clean.

7, paint project should ensure that the surrounding hardware accessories, glass clean.

  

Third, the villa decoration carpentry project acceptance standards

1. Filling between the door and window frame and the wall should be full.

2. Doors and windows cut straight, flat surface smooth, flexible switch, no upturned.

3. The installation position of the door and window hardware is appropriate, the sides of the slots are neat, the types of hardware are complete, and the wood screws are tightened.

4, after the installation of wood hanging cabinets, solid, no loose.

5. The hanging cabinet is reliable and safe for hoisting. It is close to the wall surface and ceiling surface without any gaps.

IV. Acceptance standards for hydropower projects in villa renovation

1. Tools used in hydropower acceptance

Simple test tool test tools include pressure test pumps, adjustable wrenches, hexagonal wire, raw material tapes, plugs, etc. Other possible uses include jacks, pressure gauges, water tanks, connecting hoses, and rocking watches.

2. Preparation for hydropower acceptance

Use a hose to connect the hot and cold water pipes to form a circle. At this time, the pressure is 0. The other outlets except for the lowest one of the pressure test pipes shall be sealed tightly with a plug. It is recommended to use solid and durable copper plugs, etc. Metal plugs.

3, water pressure test before acceptance

(1) Open the inlet valve, slowly fill the water from the lowest outlet of the pipeline, fully discharge the gas in the pipeline, and tighten the pressure test pump switch.

(2) Close the main inlet valve and slowly increase the pressure on the pipeline. After boosting up to the specified test pressure, observe whether the joints and plugs are leaking.

(3)PPR, aluminum-plastic PPR, steel-plastic PPR and other welded tubes are maintained for more than 12 hours, and non-welded tubes such as aluminum-plastic tubes and galvanized tubes are kept for more than 24 hours, and the pressure is maintained as qualified. The pressure drop does not exceed 0.05 MPa as qualified.

4, water detection outlet is smooth

After the acceptance of electricity, it is necessary to pay attention to the discharge pressure test pressure, the end of the pipe connected to the water distribution parts, water pressure to work, open the water distribution parts in batches, test whether the outlet is open.

5, relevant standards and precautions for acceptance of hydropower

(1) The test pipe pressure shall be 1.5 times the working pressure of the pipe system, and shall not be less than 0.6 MPa. The pressure value shall be generally between 0.6 MPa and 0.8 MPa. The bigger the better, the longer the pressure time is, the better.

(2) The pipelines buried in the floor surface and in the wall must be hydrostatically tested before sealing the tank.

(3) When testing pressure, the pipeline shall be fixed, the pipeline joints shall be exposed, and the water outlets of the pipelines shall not be connected with water distribution equipment.

(4) Pipes with hot melt connections should be used. Hydrostatic tests should be carried out 24 hours after the installation of the pipes.

(5) Other reasons for the failure of the test: The plug is not installed, and the main valve of the globe valve has quality problems.

6, electrical to meet the electrical construction standards

Electrical requirements shall comply with the standards for the acceptance of construction electrical engineering construction quality GB50303-2002.

Editing summary: The above is the villa decoration construction and acceptance of villa decoration general knowledge about how much money, villas such a large building relative to our ordinary unit building, its decoration process may be more tedious, and should take into account the space The overall beauty, it is recommended that you consult a professional decoration company for us to create a comfortable villa living environment.

Villa Encyclopedia Villa Design Villa Picture Villa Decoration Villa Design Villa Decoration Construction

Washing machine carbon brushes transfer electricity to the armature of the motor.  The armature will then spin and the drum will turn via the drive belt.  Washing machine carbon brushes are spring loaded in order that they are always touching the motor armature.  Once they are worn to the point where contact is no longer possible the washing machine motor will not turn.

Of course there are other components including electronics that are also responsible for motor rotation but worn carbon brushes are one of the most common reason for your washing machine drum to stop turning and spinning.

If your brushes are worn or damaged when you come to use your washing machine it will fill up with water, appear to sit idle for the duration of the wash and spin cycle (because the drum won't turn), and then drain out the water, and when you open the door of the machine to remove your clothes they will still be soaking wet!

You can find further help and advice here relating to other faults that can cause your washing machine drum to stop turning.

Washing Machine Carbon Brush

Washing Machine Carbon Brush,Professional Washing Machine Carbon Brush,Washing Machine Motor Carbon Brush,Washing Machine Carbon Brush Motors,Washing Machine Carbon Brush Bushing

Haimen Hailing Carbon Industry Co., Ltd. , http://www.carbonbrush-hl.com