1, in strict accordance with the measurement of construction drawings, control construction.
2. Install the corners and find the parallel (shape): Use the spirit level to measure the level; According to the height specified by the customer, or the height required for the installation of the project, the lowest “point†on the top surface of the installation shall be leveled and top corners. Technical Standard: When the upper corner is required, the corners and corners should be closely and seamlessly between the corners and the wall. “There is no gap between the corners and the wall. After the corners are good, a horizontal straight line is required.
3. Install the keel: Determine the direction of the keel according to the design direction of the aluminum buckle plate. After the determination, mark the distance from the keel line and the punching point on the roof, and use the electric hammer to punch the hole. The depth of the hole should not exceed 3 cm. Cracked (broken) wire embedded pipes in the civil engineering works inside the wall, geothermal pipes, etc., after the hole is ready, the matching internal expansion will be expanded into the hole. According to the height of the corners, the galvanized wire is sawed and put into the inner bulge. Cut the keel according to the length of the room and fix the keel on the wire with a nut.
4. Lacquered aluminum buckle: (before laying the aluminum buckle plate, make sure whether there is any other installation equipment, circuit pre-embedded), and then confirm according to the measurement construction drawings, plate type, color, collocation ratio, and orderly, the first block What color, length of the board should be arranged, requirements: When platoons, the gussets should be seamless with the corners. According to the requirements, the position of the lighting fixtures, ventilators, bathroom heaters, and smoking machines to be installed on the aluminum buckle board shall be marked so as to facilitate the smooth progress of the subsequent project.
5. Hygienic cleaning work after installation: Remove the protective film, clean the stains and fingerprints with a clean cloth, check and check. Finally, all waste generated by the installation will be cleaned and packaged.
Decoration process room
Wood plastic screwdriver,wood screwdriver,good quality screwdriver,non-slip screwdriver
henan horn tools co.,ltd. , https://www.nbhorntoolsltd.com