DNC transmission settings and usage (3)

The program transfer operation process is as follows:

(1) Open the CNC-EDIT transmission software, write the program to be transferred in the editing area or open the program stored in the computer, and click the “DNC Transfer button” to enter the program transfer operation page (Fig. 7).

(2) In the CNC machine operation panel, select the “EDIT” mode to start receiving or reading the program.

(3) Click the 1.Send button on the program transfer operation page (Fig. 7) to transfer the program in the computer to the CNC machine. The transfer process page is shown in Figure 9.

Figure 9 DNC Transfer Process Page

3. NC Sentry transmission software


Figure 10 NC Sentry operation page

The operation page after the NC Sentry transmission software is opened is as shown in FIG. 10, and the program can be written or the existing program can be opened in the operation page. Click the program transfer icon to enter the page shown in Figure 11. Click on the buttons to enter the transmission parameter setting page (as shown in Figure 12). After setting the parameters, press OK to exit.

Figure 11 DNC Transfer Operation Page

Figure 12 parameter settings page

Previous page next page

Magnetic Track Light

Simple installation, different lamps can be equipped, and the number of lamps can be increased or decreased freely. When there is no limit to the number of lamps installed on the track, it can theoretically not exceed the wattage of the transformer power supply.

Magnetic Track Light,Magnetic Spotlight,Magnetic Light,Magnetic Down Light

JINGYING , https://www.jingyingoptical.com