In home improvement projects, the most vulnerable to the rainy season is usually paint and partial masonry projects. Due to heavy rainfall during the rainy season and high humidity, the surface of the walls and other surfaces tends to gather a layer of water vapor; continuous rain will make the paint white, causing the newly painted latex paint to foam, and even fall off; when building a new wall, cement and Dust is not easy to dry, affecting the entire project. However, the impact on hydropower processes and woodworking processes is relatively small. Therefore, as long as a reasonable arrangement of procedures, make some adjustments during construction, it is possible to avoid all kinds of unfavorable rainy days. In this way, it is not necessary for the decorator to delay the days of his relocation just because of Huangmei’s arrival, and to be able to choose the decoration time more freely.

Huangmei Season Masonry Process Focus

In mason construction. Huangmei air is relatively humid in the season, if the cement shows that the agglomerate shows that it has been affected by dampness, it must not be used with luck. The cement with poor cementation is poor in adhesive strength, and it is easy to break off. In order to save a few small money, it may not be worthwhile to cause wall cracking or collapse in the future.

In the process of paving tiles and floor tiles, the tiles must be soaked before laying. The time can be slightly less than the non-rainy season. Soaking one to one and a half hours is enough, and it is also a waste of time. For the batch work of tiles or floor tiles, it is recommended to operate in fine weather for 3 consecutive days in the rainy season, otherwise there will be jointing and yellowing.

Huangmei Season Hydroelectricity Process Focus

In the hydropower process, attention should be paid to the standardized operation of the circuit reconstruction. When the rainy days are renovated, the bare wires cannot be directly buried in the wall or the floor. The PVC wire and pipe must be used for protection, especially when it is raining on the balcony. In a wet place, be sure to wrap copper wires that are exposed outside the wires during embedding and prevent the wires from short-circuiting after being exposed to moisture. For wires that are surrounded by damp wood keels, joinery, etc., care should be taken that if it is not careful, it is likely to cause a fire. During the Huangmei Season hydropower construction, special attention should be paid to safety. Due to the high degree of air adaptability, it is easy to carry out dangerous operations with live operation. If possible, wear insulated gloves and pay special attention to the operation.

Huangmei Season Carpentry Process Focus

It should be noted that it is not appropriate to make furniture door leaf and other relevant surface decoration during Huangmei season, because the components such as the door leaf have high requirements for the moisture content of the material and the external climate. The door leaf made and shaped in Huangmeitian will be easily deformed in the future. . So you should pick more dry weather to make. In the construction process of woodworking, in addition to the need to timely seal primer treatment on the surface of wooden products, in order to prevent the shrinkage of the material after the decrease of the moisture content of the wood, resulting in defects such as imperfections and unevenness, it is necessary to close the wood products. There is a certain margin left at the slats, and the wood products should be placed after the production is completed. After the materials are basically stable, they can be modified.

In the process of transporting the floor, it should be wrapped with plastic cloth after being packed into the original packaging, otherwise the floor will absorb the moisture in the air and then be deformed. In the cloudy day paving wood floors, the owners should pay attention to remind the decoration staff to make the paving compact. Otherwise, once the sky is clear, the moisture will be evaporated and the wood floor will shrink. The floor will reveal a large gap. Put 8-16 hours into the bag, use natural ventilation for dry and wet adjustment, and then brush the varnish twice to seal and then pave.

Mei season paint process focus

Huangmei seasonal decoration putty is very particular about the work, generally require putty powder batch embedded twice, but remember, be sure to dry thoroughly after the first pass after the grinding and the next batch of embedded work, otherwise it will cause the wall Face cracking. To judge whether the putty is dry or not, teach everyone a method that can be polished with sandpaper. If it is gray and not sticky, it means that it has dried out. Huang Meitian decoration paint will not be mildew, but will be blistering, white, do not panic, as long as the participation in the paint does not exceed 15% of the anti-white water, you can solve this problem.

Wooden Paint and Wall Paint No matter what type of paint is applied during the renovation, it must be confirmed that the paint on the front has been completely dried out before it can be used to paint another paint, otherwise the paint surface will undergo abrupt changes.

When decorating, special attention should be paid to the paint not to be spotted or exposed. This requires that the material must be dry before the paint can not lock the water in the inner layer. Huang Mei's late-season decoration focus

In the later stage of the renovation, during the installation process, the top surface of the object needs to be fastened to prevent cracking after the weather is fine. The wall of the Huangmei season is very damp because it prevents the dampness of the back of the furniture.

Summer decoration knowledge Three trees Painted Bay window Decoration Paint Cement Furniture Latex Paint Home Decor Tiles Tiles Floor Tiles Balcony Tiles

Bulk water meter

Bulk Water Meters,Flanged Bulk Meters,Bulk meter electricity

Ningbo Jingcheng Technology Co., Ltd. , https://www.jingchengmeter.com