After living in our house for a period of time, we can change the decoration style of the house, we can renovate the house, then what are the methods of home renovation? What are the precautions for the second renovation? The questions are all we want to know, let Xiaobian come to answer them for everyone, hope to help the friends who want to decorate and renovate .
First, what is the method of home renovation?
1. The renovation of the secondary waterway of the home decoration follows the principle of “water walkingâ€, which is easy to maintain in the later stage, and does not need to greatly increase the height of the ground.
2, the home decoration waterway transformation commonly used reference size data (the size is based on gross damage untreated wall data): shower water mixer hot and cold water pipe spacing 150MM, 1000-1200MM from the ground; upper flip cover washing machine nozzle height 1200MM; electric water heater to The height of the nozzle is equal to the net height of the layer - the distance from the top of the electric water heater is fixed - the diameter of the electric water heater - 200MM; the height of the water supply basin of the basin is 450-550MM; the water supply to the toilet is 200MM from the ground, and the distance from the toilet is 250MM to the left; It is better to go out of the pool itself 200MM. Other water supply and drainage dimensions are determined by product model.
3. The waterway reconstruction strictly follows the direction and positioning of the design drawings. In the course of practice, it is necessary to contact the relevant product manufacturers through the owner to master different types of cabinet treasures, net water softeners, washing machines, water basins, bath mixers, water heaters. The location and size of the water supply and drainage ports required by the model to prevent operational errors and prevent the installation of related equipment in the later stage.
4, in general, the direction of the water supply, right cold left heat (except for special requirements of individual equipment).
5. Pipe cutting: The pipe is cut by special pipe shears. The pipe clamp of the pipe should be adjusted to match the diameter of the pipe to be cut. When the rotation is cut, the pipe should be evenly applied. The pipe should be vertically flat without burrs.
6. PPR pipe welding: The PPR pipe adopts the hot-melt connection method as reliable, the interface strength is large, and the safety performance is higher. Remove dust and foreign matter from pipes and accessories before connecting. Once the connection is complete, the tube and the tube must be held tightly to allow sufficient cooling time to be released.
7. When hot-melt pipes of different materials such as PPR, PB and PE are connected to each other, special conversion joints or mechanical connections must be used, and they cannot be directly welded.
8. The top surface of the water supply pipe should be fixed by metal elevators. The distance between straight fixed cards is generally ≤600MM.
9, the second-hand housing drainage pipe renovation attention to the original metal pipe and PVC pipe joints special treatment, to prevent improper handling of water pipes leaking water.
10. If there are conditions in the room, the total control valve of the water supply pipe should be installed as much as possible to facilitate future maintenance; if the water meter is modified, the maintenance space must be reserved, and the water meter should be kept level after the change.
Second, the second renovation and renovation considerations
1. It is indeed necessary to renovate the place. After deciding to renovate the house, unless it is determined that the entire house needs to be reinstalled, otherwise we need to tell the constructor which room does not need to move, which part is all in the second renovation. Demolition and re-decoration, these things must be clearly defined, otherwise the construction personnel may remove the place without disassembly if they do not know.
2, wall and floor renovation should pay attention to, some people will be particularly required in the second renovation, the home wall and the ground should be re-processed, do not use the current color or tile, these positions need to be processed, thousands Don't do it yourself. Be sure to ask professional construction workers to pick up the floor or remove the paint or wallpaper on the wall. This kind of treatment will happen in your own hands. In order to avoid it, don't do it yourself.
3. Renovate a single room. If you only reinstall a single room, don't think that the cost and project progress will be very fast. In fact, the second renovation will take more time, because the entire room renovation involves all the decoration work. Instead, it takes more time than a single reload, and the cost is higher, especially the wiring needs to be extra careful.
The above small series introduces the decoration and transformation methods and precautions for everyone. I hope that we can help our friends. We must pay attention to these problems when we are renovating. If you want to know more about home decoration information, please continue to pay attention to it. Home network.
More related wonderful reading:
What are the things that need attention when hydropower renovation?
Some small taboos for partial renovation: tips you don’t know
How to decorate an open-air balcony? Open-air balcony renovation and transformation coup
How to transform 48 square meters of second-hand housing? 48 square meters renovation renovation strategy
Say goodbye to the 47 square meter small apartment dwelling 47 square meters decoration renovation case
Z Bracket,Z Type Bracket,Z Bracket Anchor,Stainless Steel Z Brackets
Taizhou Risco Stainless Steel Products Co.,Ltd , https://www.riscofastener.com