What are the new house renovation steps?

Renovating a new house is a big event in life. If you want to decorate your new house more warmly and comfortably, you are afraid that you can't find a suitable engineering team. Therefore, before the start of construction, it is enough to make the owner unable to start. In fact, as long as we have mastered some of the relevant new house decoration precautions and procedures, new house decoration will not be so difficult. Mainly divided into the previous design, the construction of the medium-term and the late acceptance, master some of the knowledge associated with it to be able to better ensure the quality of the new house decoration. Following with me to understand the new house decoration and what are the steps of the new house decoration.

New house renovation steps

1. Early design

According to the members' living habits, detailed measurements are made on the whole. include:

Clearly decorated area. Especially the wall surface and floor area;

Clear wall dimensions. Especially the wall of furniture.

2. Demolition of the main body

Followed by the main demolition reform. Including: demolition of walls, walls and so on.

3. Hydropower renovation

Before the hydropower reform, cabinet measurements are required. At the same time, it includes: whether the position of the hood, water meter, and water inlet is easy to install. After the waterway was transformed, waterproof the bathroom.

4. Woodworking

Appearance order: wood → tile → oil. Follow the principle of "who is dirty on who is first".

  

5. Tiling

In the process of “bricklayer”, the following three steps are also involved:

Install rocker and window sill. The threshold stone and the floor tiles can be completed at the same time. After the shop is finished, the marble and window covers are sealed with glass glue.

Install a floor drain. Floor drains and floor tiles need to be installed in combination and should be bought early.

Install hood. After the kitchen is laid out, consider installing a hood.

"The bricklayer's second child" leaves the floor, followed by a secondary measurement of the cabinet.

6. Brush wall paint

“Oil worker” came into play to paint the furniture. If you plan to put wallpaper, you need to do wall surface treatment.

7. Kitchen ceiling

While kitchen ceilings, other kitchen and toilet equipment should also be installed, or leave gaps.

8. Kitchen cabinet installation

Ceiling ends and cabinets can be installed. About a day. Before this, it is best to open the gas and commission it.

9. Door installation

After the cabinet is installed, the door can be installed. About one day, at the same time, prepare hardware.

  

10. Floor installation

Two days after the wooden door is installed, the floor can be installed for about one day.

11. Paving Wallpaper

Two days after the floor is installed, wallpaper can be paved for about one day.

12. Radiator installation

On the second day after the wallpaper is finished, you can hang the radiator for about one day. Correct installation sequence: wooden door → floor → wallpaper → radiator.

13. Switch socket installation

Determine the number of switches and sockets, location, etc., be aware of.

14. Lighting installation

Install lights, bid farewell to the dazzling light of incandescent lamps.

15. Hardware ware installation

Including: towel pendants, drying racks, etc. After the lamps and metal wares are installed, the entire home is “live”.

16. Curtain rod installation

The curtain rods are installed first, and the curtains are installed later to save unnecessary hygiene problems.

17. The pioneering cleaning

Before cleaning up, do not install curtains and keep more space for activities.

18. Furniture approach

Before buying furniture, you must know the size of the furniture and do not make a hasty decision.

19. Appliances approach

Appliances, furniture, and accessories come into play, and the installation of the installation is ready for occupancy.

  

New house decoration notes one:

Do not cut the load-bearing wall, do not destroy the wall, reduce the life span of the house, and leave hidden dangers for safety.

New home decoration matters two:

Do not use marble in a large area and increase the burden on the floor. The relevant regulations: no more than 40 kg/m2.

New home decoration considerations three:

Toilet waterproof should be done well. In particular, the laying of tiles should be tilted towards the floor to allow drainage.

New home decoration note four:

To choose the copper wire. Otherwise it may cause fire. Grooving on the wall requires the use of PVC pipes.

New house decoration note five:

The kitchen gas tank should be careful to stay away from the wooden cabinet. If the gas leaks and catches fire, the consequences will be disastrous.

Editing summary: The above is the new house decoration notice What are the new house renovation steps is what the relevant knowledge, hope to help meet the needs of friends! For more information, please continue to pay attention to our website, follow-up will show more exciting content.

New home decoration attention

Analog PH Sensor

The pH sensor is an important part of the PH ORP Analyzer. The analog pH sensor usually does not have any signal output, and a transmitter is required to convert the chemical signal into an electrical signal. Daruifuno's pH electrodes are online composite electrodes, which are composite electrodes combined with a glass indicator electrode and a reference electrode. The measurement principle of pH is based on the potential difference measured in the solution by the working battery composed of the measuring electrode and the reference electrode, and the online monitoring of pH is realized by using the linear relationship between the pH value of the solution to be measured and the potential of the working battery .
Daruifuno's analog pH sensor come in a variety of styles, including ASP120 series glass electrodes, which are suitable for various special industrial environments. They are often resistant to high temperatures and strong acids and alkalis, and are used in fermentation, pure water, and chemical industries. There are also pH probes packaged in plastic cases used in surface water monitoring, sewage plants, water plants, aquaculture and other industries. Of course, we also have low-cost pH electrodes for use in laboratories or agricultural irrigation and hydroponic industries.

Our pH electrodes have built-in temperature cells, fast response, large reference and long life.

ph sensor

The life of the analog pH sensor is generally 3 to 24 months, which should be determined according to the specific application environment and maintenance frequency. For special high temperature and high pressure, strong acid and alkali or chemical industry, the life of the electrode cannot be guaranteed. However, we will continue to improve our products according to customer needs and actual usage conditions, so as to make pH sensors more competitive and gain the trust of customers.

Analog Ph Sensor,Ph Sensor,Water Ph Sensor,Glass Ph Probe

Suzhou Delfino Environmental Technology Co., Ltd. , https://www.daruifuno.com