Blank house inspection room: Precautions must not be underestimated!

In the previous article, Xiao Bian introduced the related matters of rough room decoration, I believe everyone still has the impression. Decoration is a big deal, but the inspection room must not be ignored! What are the matters needing attention in the rough house inspection ? And listen to the decoration home decoration network Xiaobian Road!


毛坯房验房


Blank house inspection room:

1. When the rough house is inspected, the information prepared by the developer must be complete. Including "Residential Quality Assurance", "Residential Instruction Manual", "Completion Acceptance Record Form", area actual measurement table, pipeline distribution completion map.

2, the details of the site inspection should pay attention to:

a. Whether the installation of doors, windows and accessories is tight, whether the push-pull is smooth and unobstructed, and whether the surface of the door and window is scratched or deformed;

b. Whether the circuit is smooth, insulated and safe; whether the material is up to standard;

c. Perform leak test, drainage quality inspection and waterproof test of kitchen and toilet;

d. Water pipeline pressure test;

e. The wall and the ground should be level, and there should be no cracks, empty drums, bumps, etc., and if necessary, feedback to the developer for repair;

f. Take the level to measure the floor area, compare the previous area measurement data, the gap can not be too large;

g. Ventilation systems such as flue and exhaust ducts are exhausted smoothly, and there is no foreign matter blocked.

h. Whether the ceiling installation is firm, there is no loose place, if there is, it should be remedied or modified in time, otherwise there is a great potential safety hazard.

3. Check carefully whether the supporting facilities are made according to the requirements stipulated in the purchase contract.


毛坯房验房注意事项


4. The problems found during the inspection process must be carefully recorded and written down. After the developer solves these problems, they can stay.

5. When receiving the house, the developer must be required to give you the home inspection form when the house is inspected, and the form should have the signature and seal of both parties, otherwise you can refuse to sign. Because of this form, you will be able to use the form to find the developer to compensate for the loss and protect your legal rights.

The above is the related knowledge of the rough house inspection room introduced by the decoration home decoration network Xiaobian, I hope you can gain something after watching! Although the rough house is only a “first-time house”, at the time of acceptance, the above five points regarding the inspection of the rough house still need to be noted. More exciting content, please also pay attention to our decoration encyclopedia section!

ZJW Feeding Pumps

Naipu ZJW series filter press feeding pump accept unique hydraulic desin and installation mode of the

impeller,ensure that its pump performance curve be more steep than normal pumps,is more suitable to use in the

filter press feed varies according to the changes of the resistance in order to realize the large capacity,

low pressure feeding and low capacity,high pressure filter.The pump is widely used in the coal washery,

environmental protection,aluminum factory,smelting plant etc.

Construction Drawing

Construction Drawing

NP-ZJW Pump Performance Curve

ZJW curve

Performance Parameters

Performance parameters




Zjw Feeding Pumps,Feeding Pump,Horizontal Feeding Pump,Filter Press Zjw Feeding Pumps

Shijiazhuang Naipu Pump Co., Ltd. , https://www.naipu-pump.com