Tile paving notes: fine craftsmanship gives you a beautiful space

Paving tiles is a craftsmanship, requires exquisite craftsmanship and meticulous craftsmanship, so that you can achieve the beautiful and neat effect you want, saving you money and worry! So what do you need to pay attention to when laying tiles ? Don't worry, let's let the decoration home decoration network Xiaobian come to introduce you to the related matters of tile paving, I hope to bring you convenience!


瓷砖铺贴


  First, the wall tile paving

1. The dirt on the wall should be cleaned up in advance, and the water should be wetted one day in advance. If the base layer is a new wall, it is necessary to arrange bricks, bullets, and wall tiles when the cement mortar is 70% dry.

2. Before affixing the wall tile, check the tile quality first, then soak the tile with water for more than two hours until the tile no longer bubbling, and then dry it after soaking.

3. Before tiling, the positioning should be carried out and the bricks should be arranged. The non-whole bricks should be discharged at the corners. Generally speaking, one wall should not be attached with two rows of non-whole bricks, and it should be noted that the width of non-whole bricks should not be less than 1/3 of the whole brick.

4. Before tiling, first determine the horizontal direction and vertical direction. When laying the tile, the surface of the tile must be kept flat, the joints must be straight, and the width of the gap should be uniform.

5, the paving of the corner brick should pay attention to the correct pressure, the paving of the corner brick can be made 45 degree angle docking.

6. In the process of tile paving, if you encounter protrusions such as pipelines and lamp switches, you must use whole bricks for cutting, and do not use non-whole bricks to make pieces together.

7. The proportion of cement mortar is controlled at 1:2, evenly spread on the back of the wall tile. The thickness of the mortar should be 6-10mm.

8. When paving tiles, it is not advisable to apply them to the top at one time to prevent the paving from falling and hurting people.

9. After the paving is completed, wait for the wall to dry out, check whether there is any color difference, empty drum, etc. If the empty drum rate exceeds the required 5%, it is unqualified and needs to be re-paved.


瓷砖铺贴注意事项


    Second, the floor tile paving

1. Before laying the floor tiles, the elastic line should be carried out first, and a 90-degree reference line is formed on the ground and the doorway is opened. The elastic line starts from the doorway to ensure that the entrance is a whole brick.

2. Before tiling, the tiles should be soaked for half a day until the bricks do not bubble.

3. When paving the floor tiles, the cement mortar should be evenly applied to the back of the tile. After the bricks are laid, use a rubber hammer to gently tap.

4, the kitchen and bathroom floor paving should have sufficient drainage slope to ensure that no water is accumulated.

5, pay attention to whether the tiles need to be mosaic or to be laid in a uniform direction.

6. After the floor tiles are laid, the caulking agent or white cement should be used to fill the joints with wet mortar.

7. After the floor tiles are laid, the cement and caulking agent attached to the brick surface should be wiped clean in time. Otherwise, it will be difficult to clean after a long time. In addition, cover the floor with thick cardboard or old carpet to protect it, and stick the tape between the joints. After 12 hours of paving, tap the brick surface to check if there is any empty drum, if there is any need to re-lay. Also pay attention to the floor tiles for 24 hours before walking.

The above is the related knowledge of the tile paving introduced by the decoration home decoration network Xiaobian. I hope that all the owners must pay attention to the check and pay attention to the details when paving the wall or floor tiles to achieve better tiling effect. More exciting content, all in the decoration encyclopedia section!

Subway Tunnel Lining

It is convenient to adjust the trolley according to the construction of the variable cross-section second lining of the subway tunnel. According to the change of the subway tunnel section, the width of the construction trolley is randomly adjusted to adapt to the subway tunnel section. The construction requirements are changed. The adjustment of the trolley Convenient and fast, with few operators, low potential risk, low cost and high work efficiency.

Tunnel Lining,Subway Tunnel Lining,Construction Inner Wall Trolley,Subway Tunnel Formwork

Anshan Lijian Engineering Group Co. LTD , https://www.lijianformwork.com